Skip to content
Asansa Solutions

Contact centre

Occupancy & utilisation

Two figures that get used interchangeably and mean different things. One is about the agent's hour; the other is about yours.

Occupancy = handling ÷ available · Utilisation = available ÷ paid

This write-up is too long to fit in a shareable link. Print it or have it emailed instead — both carry the whole thing.

Result

79.2%occupancy

Inside the range most operations aim for.

Occupancy
79.2%
Utilisation
88.9%
Idle time
100 min

Sustained occupancy above 85% predicts attrition more reliably than any engagement survey. Below 70% and you are paying for waiting.

Next step

Numbers are the easy half.

Every one of these models is only as good as the operation running behind it. If you would like ours, start with a conversation.